NEWS

November 11 2011

4 Sets of 1000HP Drilling Rig Mud Recycling Equipments Delivered to Russia

4 sets drilling rig mud recycling equipments  will arrive at port of East, Russia. Then all of them will be sent to the work site. Before signing the procurement contract, our Russia client came to our factory for On-the-spot investigation. During the 2-day's visit, we showed our old and new facility to our client, and watched the equipment testing together. Russia client gave a good praise to our products and service.

November 08 2011

3 units of mud pits to Indonesia

Last month we shipped 3 units of mud pits to Indonesia. This is the 6th repeat order from this client, our goods won their trust and approval after the 1st cooperation, later they repeat 6 more orders to GN solids control. We produce hundreds of mud tanks annually, the design and material can be customized.

GN Mud Pit Shipped by Bulk Ship

November 08 2011

Two Unit 200GPM Mud Recycling System Delivery to Australia

GN deliveried 2 unit 200GPM mud recycling system to Australia at the end of Sep to Brisbane port. Just the same day, GN deliveried 1 set 500GPM jet leg mud recydcling system to Brisbane to another client. The 2 unit 200GPM mud system is working for work over drilling rig with a very compact design but 3 tanks with larger mud capacity.

GN 200GPM Mud System

November 03 2011

GN back from Argentina Oil & Gas Expo.

Latin America is one of the important market for GN solids control, we attend Brazil Offshore held in June in Macae, then 3 month later, we attend Argentina Oil & Gas Expo. Again in Otc. In Buenos Aires. We have a 38 m2 booth in La Rural, and we plan to get larger room in this exhibition next year.

GN Agentina Agent Show Decanter Centrifuge in the Expo.

November 03 2011

The 1st Set Solids Control System for ZJ40 Drilling Rig Sent to Qinghai Oi......

After 40-day's elaborately producing, the 1st set solids control system for ZJ40 drilling rig was sent to Qinghai oilfield and got into application.