NEWS

December 18 2011

Qinghai Oilfield have already ordered 2 mud tank system from us, both for drilling rig ZJ40, 1000hp mud system. We'd like to share with you this as our engineer is very happy to share the pictures and the ueser's happiness.

This system contains

shale shaker in oilfield site

2 GNPS703 shale shaker,

1 ZCQ270 vacuum degasser,

1 ZQJ250*2 desander,

1 ZQJ100*12 desilter,

1 LWF450-1100 decanter centrifuge,

all storage tanks, mixing tanks and so on.

decanter centrifge in drilling site

The client choose the desander desilter with small under shaker, as their specific project required. And our our new model with new design decanter centrifuge LWF450*1100 get a high score again. You maybe can see her in CIPPE next year(2012).

find solution for yourdrilling rig

Click here to contact GN for a professional proposal for your rig. Or if you already have some operating projects, still need to do some job on mud system, whatever it is, find and contact GN Solids Control.