GN Shale Shaker and Mud Cleaner for Solids Control
Category : Drilling Waste Management
Views : 8961
GN Shale Shaker & Mud Cleaner for Solids Control
Three Stage Solids Control
- First Stage: Shale Shaker with screen of API 80
- Second stage: 10 inch Desander for solids above 50 microns.
- Third Stage: 4 inch Desilter for solids above 20 microns.
Shale shaker screen on mud cleaner is API 230.
GN Shale Shaker and mud cleaner is widely used for oil gas drilling, HDD, CBM drilling, water well drilling, Geothermal well drilling, diamond core drilling, Tunnel boring machine slurry separation.
Link for shale shaker: http://gnsolidscontrol.com/shale-shaker
Link for mud cleaner: http://gnsolidscontrol.com/mud-cleaner