NEWS

November 11 2011

4 sets drilling rig mud recycling equipments  will arrive at port of East, Russia. Then all of them will be sent to the work site. Before signing the procurement contract, our Russia client came to our factory for On-the-spot investigation. During the 2-day's visit, we showed our old and new facility to our client, and watched the equipment testing together. Russia client gave a good praise to our products and service.

The order including:
8 sets Vibration Screen GNZS703
4 sets screw pump
4 sets mud conditioner GNZJ703
8 sets slurry pump SB6X5-14
4 sets high-speed centrifuge GLW355X1250N

And yet, the client need the mud system urgently, they require that the 4 sets mud system in first order should be delivered within 35 days after receiving the deposit. In order to offer the high quality products, GN person overcame all difficulties, eventually, we haven't make client disappointed.

As our top quality and team work spirit in producing, this client placed the second order for another  4 sets drilling mud recycling system. Now, the producing for the second order is in full swing.

If any need for mud cleaning equipments aroused, just feel free to contact with us.